Skip to content
SarvexDocs
Esc
↑↓navigate↵open⌘Jpreview
On this page

Going live / validation

How validation works and what it takes to go live — pre-validation, the checks Sarvex runs, and what holds it up.

Validation runs the checks Sarvex requires before agent checkout turns on. Run it from Path or the Validation screen; each check reports pass, fail, or warn, with what to fix.

Pre-validation is the stage you trigger yourself. It runs the reconciled UCP spec’s checks — request signing, negotiation, catalog lookups, checkout — directly against your endpoints, the same checks that run automatically at Path’s Verified stage. Every run is pinned to a target spec version, so “conformant” doesn’t shift underneath you later. The Validation screen keeps a full run history and lists open failures with what to fix.

Going live — reaching Active on Path — depends only on your endpoints passing conformance. Once every check passes, agent checkout is live — there’s no separate activation switch.

Common things that hold pre-validation up:

  • Products missing fields agents need — check each product’s readiness state under Store
  • The connector not currently paired or reachable
  • Recent sync issues flagged under Health

Validation also tracks review status on individual agent surfaces, which have their own live paths. See Surface live paths.

Was this page helpful?